Electrical materials for a villa come in two main phases. Preparing the list in advance saves time and avoids stoppages for a missing part.

Phase 1: first fix (before plaster and concrete)

  • PVC conduit in 20, 25 and 32 mm depending on circuits.
  • Conduit fittings: bends, couplers, adaptors, saddles, PVC cement.
  • Socket and switch back boxes (single and twin) — for concrete or gypsum.
  • Junction boxes for ceilings and lighting points.
  • Distribution board enclosures in position.
  • Fish tape and fixings (anchors, screws).
  • Low-current conduit and boxes: internet, TV, CCTV, intercom.

Phase 2: pulling wires

  • 1.5 / 2.5 mm² wires for lighting and general sockets.
  • 4 / 6 mm² wires for AC units, water heaters and the kitchen.
  • Main feeder cable from the meter to the main board, sized to the load.
  • Earth wire sized for each circuit.
  • Cat6 data and TV cables where needed.

Phase 3: boards and protection

  • Main board and sub-boards with enough ways plus spares.
  • MCBs for each circuit rating.
  • RCCB/RCBO earth-leakage protection for bathrooms, kitchens and outdoors.
  • Busbars, terminals and earth bar.
  • Earthing system: rods, copper conductor, clamps, inspection pit.

Phase 4: second fix

  • 13 A sockets, single and twin, and USB sockets.
  • Light switches, one-gang, multi-gang and two-way for stairs and corridors.
  • 20 A DP outlets for water heaters and AC units.
  • TV and data outlets.
  • Frames and plates in the same series and colour.
  • Weatherproof outdoor sockets.

Phase 5: lighting

  • Downlights and spotlights for gypsum ceilings.
  • Concealed LED for decor.
  • IP65 outdoor lighting for façades, garden and boundary wall.
  • Emergency lighting for stairs and exits.
  • Exhaust fans for bathrooms and kitchen.

Cost-saving tips

  1. Order in phased deliveries but at one agreed price for the whole project.
  2. Buy wires by the drum and conduit and fittings by the box.
  3. Use one socket/switch series for easier future maintenance.
  4. Add a small spare (5 – 10%) for small parts.

Prepare your order with Mokaiteeb

Send your drawing or bill of quantities and our team will prepare a complete quotation for every phase, delivered to your site anywhere in the Kingdom.

Related products

Need a quotation for your project?

Send us your item list or bill of quantities and our sales team will reply with the best price — shipping from Al-Ahsa to every region of the Kingdom.

More guides